The train is southbound from White Plains and is passing under the Bronx River Parkway bridge. The bridge is at about chaining station 115+100 on map 21 of valuation section 52. The H 57 means overhead bridge No. 57.
Showing a Standard 8 - Suberb Division for NYC & HR Railroad. Each car equipped with 2-ge-89-225 HP motors. Side view of the train, 3/4. Showing an 8 car MU train, of the NYC & HR RR, photographed on Electric division by GE. Built by American Car…